As it is foreseen that harmonised rules on transparency will pass the comitology procedure in 2012 the Commission establishes for the development of harmonised electricity rules this annual priority list for 2013:
-
capacity allocation and congestion management rules including governance for day-ahead and intraday markets including capacity calculation (adoption under comitology procedure),
-
rules for longer-term (forward) capacity allocation (drafting of network code),
-
network connection rules:
-
network rules on generator grid connection (adoption under comitology procedure),
-
network code on distribution system operator and industrial load connection (finalise network code and start comitology process),
-
network code on High-voltage direct current transmission system connection,
-
-
system operation (finalise network codes on operational security, on operational planning and scheduling and on load-frequency control and reserves and start adoption process(5)),
-
balancing rules including network-related reserve power rules (finalise network code on balancing),
-
rules regarding harmonised transmission tariff structures and/or investment incentives.