The Annex to Implementing Decision (EU) 2016/2323 is replaced by the text in the Annex to this Decision.
Commission Implementing Decision (EU) 2018/1906 of 30 November 2018 amending Implementing Decision (EU) 2016/2323 to update the European List of ship recycling facilities established pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance.)
Commission Implementing Decision (EU) 2018/1906 of 30 November 2018 amending Implementing Decision (EU) 2016/2323 to update the European List of ship recycling facilities established pursuant to Regulation (EU) No 1257/2013 of the European Parliament and of the Council (Text with EEA relevance.)
THE EUROPEAN COMMISSION,
Having regard to the Treaty on the Functioning of the European Union,
Having regard to Regulation (EU) No 1257/2013 of the European Parliament and of the Council of 20 November 2013 on ship recycling and amending Regulation (EC) No 1013/2006 and Directive 2009/16/EC(1), and in particular Article 16 thereof,
Whereas:
Article 6(2) of Regulation (EU) No 1257/2013 requires ship owners to ensure that ships destined to be recycled are only recycled at ship recycling facilities included in the European List of ship recycling facilities published pursuant to Article 16 of that Regulation.
The European List is set out in Commission Implementing Decision (EU) 2016/2323(2), as last amended by Commission Implementing Decision (EU) 2018/1478(3).
Denmark has informed the Commission that a ship recycling facility(4) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Denmark has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
Italy has informed the Commission that a ship recycling facility(5) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Italy has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
Finland has informed the Commission that a ship recycling facility(6) located in its territory has been authorised by the competent authority in accordance with Article 14 of Regulation (EU) No 1257/2013. Finland has provided the Commission with all information relevant for that facility to be included in the European List. The European List should therefore be updated to include that facility.
The Commission has received applications in accordance with Article 15(1) of Regulation (EU) No 1257/2013 for two ship recycling facilities(7) located in Turkey to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of Regulation (EU) No 1257/2013, the Commission considers that the facilities comply with the requirements set out in Articles 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include those facilities.
The Commission has received an application in accordance with Article 15(1) of Regulation (EU) No 1257/2013 for a ship recycling facility(8) located in the United States of America to be included in the European List. Having assessed the information and supporting evidence provided or gathered in accordance with Article 15 of that Regulation, the Commission considers that the facility complies with the requirements set out in Articles 13 of that Regulation to conduct ship recycling and to be included in the European List. The European List should therefore be updated to include that facility.
Moreover, it is necessary to correct a few data errors and inconsistencies detected in the entries of the European List.
Implementing Decision (EU) 2016/2323 should therefore be amended accordingly.
The measures provided for in this Decision are in accordance with the opinion of the Committee established by Article 25 of Regulation (EU) No 1257/2013,
HAS ADOPTED THIS DECISION:
Article 1
Article 2
This Decision shall enter into force on the third day following that of its publication in the Official Journal of the European Union.
Done at Brussels, 30 November 2018.
For the Commission
The President
Jean-Claude Juncker
ANNEX
‘
’ ANNEX
THE EUROPEAN LIST OF SHIP RECYCLING FACILITIES REFERRED TO IN ARTICLE 16 OF REGULATION (EU) No 1257/2013
PART A
Ship recycling facilities located in a Member State
Name of the facility
Method of recycling
Type and size of ships that can be recycled
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority(1)
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility(2)
Date of expiry of inclusion in the European List(3)
BELGIUM
NV Galloo Recycling Ghent
Scheepszatestraat 9
9000 Gent
BELGIUM
Phone: +32 92512521
Email: peter.wyntin@galloo.com
Alongside (wet berth), slope
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 265 meters
Width: 36 meters
Draught: 12,5 meters
Tacit approval, with a maximum review period of 30 days
34 000 (4)
31 March 2020
DENMARK
Fornæs ApS
Rolshøjvej 12-16
8500 Grenå
DENMARK
www.fornaes.dk
Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 25 meters
Draught: 6 meters
GT: 10 000
The municipality of Norddjurs has the right to allocate Hazardous waste for environmentally approved reception facilities.
Tacit approval, maximum review period of 14 days
30 000 (5)
30 June 2021
Modern American Recycling Services Europe (M.A.R.S)
Sandholm 60
9900 Frederikshavn
DENMARK
Website: http://www.modernamericanrecyclingservices.com/
Email: Kristi@marsrecyclers.com
Clipping and flame cutting after the item for dismantling has been placed in a slipway facility
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 290 meters
Width: 90 meters
Draught: 14 meters
The conditions under which the ship recycling facility operates are defined in the Environmental Permit of 9 March 2018 issued by the Municipality of Frederikshavn
The Municipality of Frederikshavn has the right to allocate hazardous waste to environmentally approved reception facilities, as set out in the Environmental Permit for the ship recycling facility.
The facility must not store hazardous waste for more than one year.
Tacit approval by the Municipality of Frederikshavn with a review period of 2 weeks.
0(6)
23 August 2023
Smedegaarden A/S
Vikingkaj 5
6700 Esbjerg
DENMARK
www.smedegaarden.net
Dismantling by quay and subsequent scrapping on impermeable floors with effective drainage systems
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 170 meters
Width: 40 meters
Draught: 7,5 meters
Tacit approval, maximum review period of 14 days
20 000 (7)
15 September 2021
ESTONIA
OÜ BLRT Refonda Baltic
Afloat at the quayside and in the floating dock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 197 meters
Width: 32 meters
Draught: 9,6 meters
GT: 28 000
Waste permit No. L.JÄ/327249. Hazardous waste management licence No 0222. Rules of the Vene-Balti Port, Manual on Ships Recycling MSR-Refonda. Environmental Management System, Waste management EP 4.4.6-1-13
The facility can recycle only these hazardous materials for which it has been licensed.
Tacit approval, with a maximum review period of 30 days.
21 852 (8)
15 February 2021
SPAIN
DDR VESSELS XXI, S.L.
Port of ‘El Musel’
Gijon
SPAIN
Phone: +34 630144416
Email: abarredo@ddr-vessels.com
Dismantling ramp
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013, except nuclear ships.
Maximum ship dimensions:
Length: 169,9 meters
(Ships above that size which can operate a zero rollover or negative ramp movement may be accepted depending on the outcome of a detailed feasibility study)
The limitations are included in the integrated environmental authorisation.
Explicit approval by the Harbour Masters Office of the port where the facility is located
0(9)
28 July 2020
FRANCE
Démonaval Recycling
ZI du Malaquis
Rue François Arago
76580 LE TRAIT
FRANCE
Phone: + 33 769791280
Email: patrick@demonaval-recycling.fr
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions (drydock):
Length: 140 meters
Width: 25 meters
Depth: 5 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment
0(10)
11 December 2022
Gardet & De Bezenac Recycling /Groupe Baudelet Environnement – GIE MUG
616, Boulevard Jules Durand
76600 Le Havre
FRANCE
Phone: +33 2359516 34
Email: infos@gardet-bezenac.com
Floating and slipway
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 150 meters
Width: 18 meters
LDT: 7 000
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
16 000 (11)
30 December 2021
Grand Port Maritime de Bordeaux
152, Quai de Bacalan - CS 41320 - 33082 Bordeaux Cedex
FRANCE
Phone: +33 556905800
Email: maintenance@bordeaux-port.fr
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions (drydock):
Length: 240 meters
Width: 37 meters
Depth: 17 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
18 000 (12)
21 October 2021
Les Recycleurs bretons
Zone Industrielle de Kerbriant 29 610 Plouigneau
FRANCE
Phone: +33 298011106
Email: navaleo@navaleo.fr
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions (drydock):
Length: 225 meters
Width: 34 meters
Depth: 27 meters
Environmental limitations are defined in the prefectural authorisation.
Explicit approval – The competent authority for the approval decision is the minister of environment.
5 500 (13)
24 May 2021
ITALY
San Giorgio del Porto S.p.A.
Calata Boccardo 8
16128 Genova
ITALY
Phone:+39 010251561
Email: segreteria@sgdp.it; sangiorgiodelporto@legalmail.it
www.sgdp.it
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 350 meters
Width: 75 meters
Immersion: 16 meters
GT: 130 000
The limitations and restrictions are included in the integrated environmental authorisation.
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013
Explicit approval
38 564 (14)
6 June 2023
LATVIA
A/S ‘Tosmares kuģubūvētava’
Ģenerāļa Baloža street 42/44, Liepaja, LV-3402
LATVIA
Phone: +371 63401919
Email: shipyard@tosmare.lv
Ship dismantling (wet berth and dry dock)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 165 m
Width:22 m
Depth: 7 m
DWT:14 000
GT: 200 - 12 000
Weight:
100 - 5 000 tonnes
LDT: 100 - 5 000
See national permit No. LI10IB0024.
Explicit approval — written notification in 30 working days
0(15)
11 June 2020
LITHUANIA
UAB APK
Minijos 180 (berth 133A)
LT 93269, Klaipėda,
LITHUANIA
Phone: +370 46365776
Fax +370 46365776
Email: uab.apk@gmail.com
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 130 meters
Width: 35 meters
Depth: 10 meters
GT: 3 500
See national permit No. TL-KL.1-15/2015
Explicit approval — written notification in 30 working days
1 500 (16)
17 March 2020
UAB Armar
Minijos 180 (berths 127A, 131A)
LT 93269, Klaipėda,
LITHUANIA
Phone: +370 68532607
Email: armar.uab@gmail.com; albatrosas33@gmail.com
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions (berth 127A):
Length: 80 meters
Width: 16 meters
Depth: 6 meters
GT: 1 500
Maximum ship dimensions (berth 131A):
Length: 80 meters
Width: 16 meters
Depth: 5 meters
GT: 1 500
See national permit No. TL-KL.1-16/2015 (berth 127A)
See national permit No. TL-KL.1-51/2017 (berth 131A)
Explicit approval — written notification in 30 working days
3 910 (17)
17 March 2020
(berth 127A)
19 April 2022
(berth 131A)
UAB Vakaru refonda
Minijos 180 (berths 129, 130, 131A, 131, 132, 133A), LT 93269, Klaipėda,
LITHUANIA
Phone: +370 46483940/483891
Fax +370 46483891
Email: refonda@wsy.lt
Alongside (wet berth)
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 230 meters
Width: 55 meters
Depth: 14 meters
GT: 70 000
See national permit No. (11.2)-30-161/2011/TL-KL.1-18/2015
Explicit approval — written notification in 30 working days
20 140 (18)
21 May 2020
THE NETHERLANDS
Keppel-Verolme
Prof. Gerbrandyweg 25
3197 KK Rotterdam-Botlek
THE NETHERLANDS
Phone: +31 181234353
Email: mzoethout@keppelverolme.nl
Shipbreaking
Maximum ship dimensions:
Length: 405 meters
Width: 90 meters
Depth: 11,6 meters
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Explicit approval
52 000 (19)
21 July 2021
Scheepssloperij Nederland B.V.
Havenweg 1; 3295 XZ s-Gravendeel
Postbus 5234; 3295 ZJ s-Gravendeel
THE NETHERLANDS
Phone: +31 786736055
Email: info@sloperij-nederland.nl
Shipbreaking
Maximum ship dimensions:
Length: 200 meters
Width: 33 meters
Depth: 6 meters
Height: 45 meters (Botlekbridge)
Recycling operations start on water to make the hull lighter; the winch to haul ships on the ramp can pull 2 000 tonnes.
The site has a permit to operate; this permit contains limitations and conditions to operate in an environmental sound manner.
Explicit approval
9 300 (20)
27 September 2021
PORTUGAL
Navalria - Docas, Construções e Reparações Navais
Porto Comercial, Terminal Sul, Apartado 39, 3811-901 Aveiro
PORTUGAL
Phone: +351 234378970, +351 232767700
Email: info@navalria.pt
Drydock dismantling,
decontamination and dismantling on an horizontal plane and inclined plane, according to the ship's size
Nominal capacity of the horizontal plane: 700 tonnes
Nominal capacity of the inclined plane: 900 tonnes
Conditions applied to the activity are defined in specifications annexed to Title AL n.o 5/2015/CCDRC, of 26 January 2016
Explicit approval
1 900 (21)
26 January 2020
FINLAND
Turun Korjaustelakka Oy (Turku Repair Yard Ltd)
Navirentie 9
21110 Naantali
FINLAND
Phone: +358 405106952
Email try@turkurepairyard.com
Alongside, drydock
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 250 meters
Width: 40 meters
Draught: 7,9 meters
The limitations are included in the national environmental permit.
Tacit approval, with a maximum review period of 30 days.
20 000 (22)
1 October 2023
UNITED KINGDOM
Able UK Limited
Teesside Environmental Reclamation and Recycling Centre
Graythorp Dock
Tees Road
Hartlepool
Cleveland
TS25 2DB
UNITED KINGDOM
Phone: +44 1642806080
Email: info@ableuk.com
Ship dismantling and associated treatment authorised with dry dock and wet berth
Any ship within the dimensions authorised within the permit.
Maximum ship dimensions:
Length: 337,5 meters
Beam: 120 meters
Draft: 6,65 meters
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013.
The site is authorised by way of a permit (Reference EPR/VP3296ZM) that limits the operations and places conditions on the operator of the facility.
Explicit approval
66 340 (23)
6 October 2020
Dales Marine Services Ltd
Imperial Dry Dock
Leith
Edinburgh
EH6 7DR
UNITED KINGDOM
Contact:
Phone: +44 1314543380
Email: leithadmin@dalesmarine.co.uk; b.robertson@dalesmarine.co.uk
Ship dismantling and associated treatment authorised within a drydock, and wet berth
Any ship up to a maximum of 7 000 tonnes
Maximum ship dimensions:
Length: 165 meters
Beam: 21 meters
Draft: 7,7 meters
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013. The site is authorised by way of a licence (Ref: WML L 1157331) that limits the operations and places conditions on the operator of the facility.
Explicit approval
7 275 (24)
2 November 2022
Harland and Wolff Heavy Industries Limited
Queen's Island
Belfast
BT3 9DU
UNITED KINGDOM
Phone: +44 2890458456
Email: trevor.hutchinson@harland-wolff.com
Ship dismantling and associated treatment authorised with dry dock, and wet berth
Any ship with the dimensions detailed in the agreed Working Plan.
Maximum ship dimensions:
The main dock (the largest) is 556 m × 93 m × 1,2 m DWT, and can take vessels up to this size. This largest dry dock is 1,2 million DWT.
The facility has a Ship Recycling Facility Plan that meets the requirements of Regulation (EU) No 1257/2013.
The site is authorised by way of a waste management licence, authorisation number LN/07/21/V2 that limits the operations and places conditions on the operator of the facility.
Explicit approval
13 200 (25)
3 August 2020
Swansea Drydock Ltd
Prince of Wales Dry Dock
Swansea
Wales
SA1 1LY
UNITED KINGDOM
Phone: +44 1792654592
Email: info@swanseadrydocks.com
Ship dismantling and associated treatment authorised with dry dock, and wet berth
Any ship within the dimensions authorised within the permit.
Maximum ship dimensions:
Length: 200 meters
Beam: 27 meters
Draft: 7 meters
Site has a Ship Recycling Facility Plan that meets with the requirements of Regulation (EU) No 1257/2013.
The site is authorised by way of a permit (Reference EPR/UP3298VL) that limits the operations and places conditions on the operator of the facility.
Explicit approval
7 275 (26)
2 July 2020
PART B
Ship recycling facilities located in a third country
Name of the facility
Method of recycling
Type and size of ships that can be recycled
Limitations and conditions under which the ship recycling facility operates, including as regards hazardous waste management
Details on the explicit or tacit procedure for the approval of the ship recycling plan by the competent authority(1)
Maximum annual ship recycling output, calculated as the sum of the weight of ships expressed in LDT that have been recycled in a given year in that facility(2)
Date of expiry of inclusion in the European List(3)
TURKEY
LEYAL GEMİ SÖKÜM SANAYİ ve TİCARET LTD.
Gemi Söküm Tesisleri
Parcel 3-4 Aliaga,
Izmir 35800
TURKEY
Phone: +90 2326182030
Email: info@leyal.com.tr
Landing method
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 100 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship.
The SRP is neither explicitly approved nor rejected as a standalone document.
55 495 (4)
9.12.2023
LEYAL-DEMTAŞ GEMİ SÖKÜM SANAYİ ve TİCARET A.Ş.
Gemi Söküm Tesisleri
Parcel 25 Aliaga,
Izmir 35800
TURKEY
Phone: +90 2326182065
Email: demtas@leyal.com.tr
Landing method
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: no limit
Width: 63 meters
Draught: 15 meters
The site has a Ship Dismantling Permit, issued by the Ministry of Environment and Urban Planning, and a Ship Dismantling Authorisation Certificate, issued by the Ministry of Transport, Maritime Affairs and Communication, which contain limitations and conditions under which the facility operates.
Hazardous wastes are handled by SRAT (Ship Recycling Association of Turkey) which operates under the necessary licence issued by the Ministry of Environment and Urban Planning.
Tacit approval
The ship recycling plan (SRP) is part of a set of documents, surveys and permits/licences that are submitted to the competent authorities in order to obtain permission to dismantle a ship.
The SRP is neither explicitly approved nor rejected as a standalone document.
50 350 (5)
9.12.2023
UNITED STATES OF AMERICA
International Shipbreaking Limited L.L.C
18601 R.L Ostos Road Brownsville TX, 78521
UNITED STATES
Phone: +1 9568312299
Email: chris.green@internationalshipbreaking.com
robert.berry@internationalshipbreaking.com
Alongside (wet berth), slope
Ships as defined in point (1) of Article 3(1) of Regulation (EU) No 1257/2013
Maximum ship dimensions:
Length: 335 meters Width: 48 meters Draught: 9 meters
The conditions under which the facility is authorised to operate are defined in permits, certificates and authorisations issued to the facility by the Environmental Protection Agency, the Texas Commission of Environmental Quality, the Texas General Land Office and the U.S Coast Guard.
The U.S. Toxic Substances Control Act prohibits the import into the US of foreign flagged vessels that contain PCB concentrations greater than 50 parts per million.
The facility has two slips with ramps for final vessel recycling (East Slip and West Slip). Ships flying a flag of EU Member States shall be recycled exclusively on the East Slip ramp.
There is currently no procedure in US law related to the approval of ship recycling plans
120 000 (6)
9.12.2023